What the Single House Zone is for
The Single House Zone keeps established suburbs as stand-alone houses on their own sections, usually one or two storeys with gardens and trees. It’s the most restrictive of Auckland’s main residential zones: one house per site, plus a small minor dwelling.
It covers about 22% of Auckland’s residential land, roughly 54 km², by our count of the council’s Unitary Plan zone map in October 2026. Only Mixed Housing Suburban, at 38%, covers more.
| Zone | Homes per site without resource consent | Height | Smallest new vacant site |
|---|---|---|---|
| Single House | One, plus a minor dwelling | 8 m | 600 m² |
| Large Lot | One | 8 m | 4,000 m² |
| Mixed Housing Suburban | Up to three | 8 m | 400 m² |
| Mixed Housing Urban | Up to three | 11 m | 300 m² |
| Terrace Housing and Apartment Buildings | None: every home needs consent | 16 m | 1,200 m² |
See Auckland zones explained for more on the other zones.
Is this address in the Single House Zone?
Zones follow property boundaries, so houses on the same street can be in different zones. Check the address, and any overlays such as special character or heritage that add rules on top of the zone.
Check the zone for an address
The rules at a glance
These are the main standards in chapter H3 of the Auckland Unitary Plan. A house or extension that meets all of them needs a building consent but no resource consent.
| Rule | Limit | Unitary Plan |
|---|---|---|
| Height | 8 m. Half of a roof pitched at 15° or more can go 1 m higher | H3.6.6 |
| Height in relation to boundary | Below a 45° line that starts 2.5 m up the side and rear boundaries | H3.6.7 |
| Front yard | 3 m | H3.6.8 |
| Side and rear yards | 1 m | H3.6.8 |
| Streams, lakes and the coast | 10 m from a stream, 30 m from a lake, and a 10 m coastal protection yard (more in some places) | H3.6.8 |
| Building coverage | Up to 35% of the net site area | H3.6.10 |
| Buildings and paving | Up to 60% of the site | H3.6.9 |
| Landscaping | At least 40% of the net site area, and half the front yard | H3.6.11 |
| Fences | 1.4 m at the front (1.8 m along half the frontage, or if half see-through); 2 m at the side and rear | H3.6.12 |
Unlike the Mixed Housing zones, the Single House Zone has no outlook or daylight standards. Read the full rules in chapter H3.
What fits on your section
Coverage, paving and landscaping are shares of the section, so what you can build depends on its size. Set the slider to your section’s area, which is on the record of title and in our free check.
Section calculator
- Buildings can cover
- Up to 245 m²35% of the net site area
- Buildings and paving together
- Up to 420 m²60% of the site
- Lawn and garden
- At least 280 m²40%, and half the front yard
- Subdividing
- Too small to splitEach new vacant site needs 600 m²
A rough guide. Net site area leaves out shared driveways to rear sites, special character areas have their own subdivision sizes, and each new site must also fit an 8 × 15 m rectangle.
Building coverage counts the footprint of buildings. The paving limit also counts driveways, paths and patios, so a big garage and a long driveway can use up a small section quickly.
Minor dwellings and granny flats
There are now two ways to add a second, smaller home: the zone’s own minor dwelling rule, and the government’s granny flat exemptions, in force since 15 January 2026.
| Minor dwelling (Unitary Plan) | Granny flat (since 15 January 2026) | |
|---|---|---|
| Size | Up to 65 m², not counting decks and garaging | Up to 70 m² inside |
| Attached to the house? | Attached or detached | Detached and single-storey only |
| Resource consent | Not needed if it meets the zone rules | Not needed if it meets the exemption’s conditions |
| Building consent | Needed | Not needed if it meets the exemption’s conditions; get a project information memorandum (PIM) first |
| Distance from boundaries | The zone’s yards: 1 m at the side and rear | At least 2 m from boundaries and from the house |
| Building coverage | Counts towards the zone’s 35% | Up to 50% across the site |
| Other conditions | Its own outdoor space of 5–8 m² | A house must already be on the site; hazard rules still apply |
The granny flat route comes from the National Environmental Standard for Detached Minor Residential Units and a new exemption in the Building Act. A licensed builder must do or supervise the work, it must still meet the Building Code, and development contributions may apply. Check the details on building.govt.nz before you rely on it.
A house that existed on 30 September 2013 can also be converted into two homes without resource consent, if the result meets the zone rules.
Neither route lets you sell the second home on its own title. Subdividing off a minor dwelling needs 600 m² for each site.
Subdividing
Each new vacant site needs at least 600 m² of net site area, and must fit an 8 × 15 m rectangle clear of yards and hazards (Unitary Plan chapter E38). So splitting a section into two vacant sites takes about 1,200 m², and still needs resource consent.
- Around existing homes: where two homes already lawfully stand on a site, it can usually be subdivided around them without the 600 m² minimum. A minor dwelling is the exception: both sites need 600 m².
- Special character areas set their own minimums, from 400 m² in parts of the isthmus to 1,000 m² in others.
- Large sites of 1 hectare or more can go down to 480 m² a site, if the average stays between 600 and 720 m².
- Subdivision Variation Controls set different minimums in some places, such as Beachlands (700 m²) and Snells Beach (1,000 m²).
What’s in force, and what’s proposed
Auckland’s housing rules have changed several times since 2022. Here’s where they stand on 23 October 2026.
| Change | Status |
|---|---|
| Plan Change 78, the Medium Density Residential Standards (up to three homes of three storeys on most sites) | Withdrawn on 9 October 2025 |
| Plan Change 120 natural hazard rules, which limit building in flood and coastal hazard areas | In force since 3 November 2025 |
| Plan Change 120 rezoning of the highest-risk flood sites, mostly into the Single House Zone (shown striped on the council’s map) | In force |
| Plan Change 120 rezoning elsewhere, including some Single House Zone land near centres and rapid transit | Proposed. Amended in August 2026; hearings are next, with decisions due by 30 June 2027 |
| Granny flat exemptions | In force since 15 January 2026 |
If you’re buying for what the land might allow later, check the address in the check above, which shows the council’s Plan Change 120 proposal where it has one, and read the Plan Change 120 page. Proposed rules can change before they’re decided.
Check everything for one address, free
Flooding, the coast, land stability, zoning, planning rules and school zones, on one page. The full report with what to do next is $29.
See a sample reportProjects that usually need resource consent
- A second storey, when it breaks the 45° boundary line or the 8 m height limit.
- A garage or carport in the front yard, which breaks the 3 m front yard and can push paving over 60% or front-yard landscaping under half.
- Building close to a side or rear boundary, inside the 1 m yard or above the boundary line.
- A second full house, rather than a minor dwelling or granny flat. It’s a non-complying activity, the hardest kind of consent to get.
- A fence taller than the limits above.
- Work in a special character area, flood plain or overland flow path, which have rules of their own.
If the only problem is a side or rear boundary rule and the neighbours sign their approval, a deemed permitted boundary activity notice is quicker and cheaper than a consent: a $1,000 deposit and 10 working days.
Otherwise, Auckland Council asks for a deposit of $3,000 for a small extension or a house with up to two breaches, or $6,500 for other residential consents, then charges by the hour. Non-notified consents are due within 20 working days of a complete application, but plans and a planner add to the cost and time.
What to check before you buy
- Confirm the zone and any overlays for the address.
- Read the record of title for covenants and consent notices, which can be stricter than the zone.
- Order the LIM and check every addition has a code compliance certificate.
- Check for flood plains and overland flow paths with our flood check. They can stop you building on parts of a section.
- Look up the Plan Change 120 proposal for the property and the sections around it.
- If your plans depend on a minor dwelling, granny flat or subdivision, talk to a planner before your offer goes unconditional.
Questions
Can I build two houses in the Single House Zone?
Not as of right: a second full house is a non-complying activity. You can add a minor dwelling of up to 65 m² under the zone rules, a detached granny flat of up to 70 m² under the 2026 exemptions, or convert a house that existed in September 2013 into two.
How big does a section need to be to subdivide?
Each new vacant site needs 600 m² of net site area and must fit an 8 × 15 m rectangle, so about 1,200 m² to split into two. Special character areas and some suburbs have their own minimums.
How high can I build in the Single House Zone?
8 m, with half of a pitched roof allowed up to 9 m, and below a 45° line from 2.5 m up the side and rear boundaries. In practice that’s two storeys.
Do I need consent for a granny flat?
Since 15 January 2026, a detached single-storey unit of up to 70 m², at least 2 m from boundaries and the house, needs neither resource nor building consent if it meets all the exemption’s conditions. You still need a project information memorandum from the council first.
Is the Single House Zone being removed?
No. Plan Change 120 proposes rezoning some Single House Zone land near centres and transport for more homes, and has already moved some high-risk flood land into the zone. Decisions on the rest are due by June 2027.